01․ In a power system with negligible resistance, the fault current at a point is 8.00 pu. The series reactance is to be included at the fault point to limit the short circuit. current to 5.00 pu is
Under construction.
02․ Capacitance voltage transformer ( CVT ) is used to
Under construction.
03․ The unit protection scheme provides
Under construction.
04․ In a 400 kV power network, 360 kV is recorded at 400 kV bus. The reactive power absorbed by a shunt reactor for 50 MVAr, 400 kV connected at the bus is
Under construction.
05․ The insulation of the modern EHV lines is designed based on
Under construction.
06․ The ratio of reset to pick up current for an induction cup relay is approximately
Under construction.
07․ Out of the following plant categories which is not the base load power plant?
Under construction.
08․ Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching?
Under construction.
09․ To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with
Under construction.
10․ The insulation of modern EHV is designed based on
Under construction.